Closing Procedure
Scenario: A packing shed finishes at 5 p.m. with a crew of ten, and the next collection is at 5 a.m.
| # | Step | Owner | What happens |
|---|---|---|---|
| 1 | Stop and clear the line | Line lead | Stop sorting, clear product from belts and note the last pallet number. Product left out is moved to cold storage or logged as waste. |
| 2 | Clean down and isolate | Cleaning crew | Wash, switch off and isolate the line, then lock out any equipment awaiting repair. Unfinished cleaning is marked on the log for the opener. |
| 3 | Check cold rooms | Shed supervisor | Read each cold-room display and record the temperature. A reading outside the set range triggers a call to the maintenance contact before leaving. |
| 4 | Reconcile stock and waste | Shed supervisor | Count pallets against the dispatch plan and enter waste weights. Differences larger than the tolerance go to the operations manager. |
| 5 | Secure the site | Shed supervisor | Lock doors, set the alarm and check chemical store and gates. The last person out confirms by phone or message to the on-call manager. |
| 6 | File the closing report | Operations manager | Review the day's report for exceptions and approve it by morning. Repeated faults become maintenance requests or corrective actions. |