Good practice

Where changes and releases differ

A change is a decision about what to alter. It carries a reason, a risk rating, a rollback idea and an approver. A release is a delivery event. It carries a build or version, a window, a checklist and a go or no-go call.

One release can contain many changes, and one change can ship across several releases. If the SOP blurs them, people approve a release without knowing what is in it. Keep a mapping record that lists the changes included in each release.

Good practice

Classify changes so most go fast

The process fails when every change waits for a weekly board. Classify changes by risk and give each class a path.

  • Standard: pre-approved, repeatable and low risk, such as a routine configuration update. Follows a written procedure and needs no individual approval.
  • Normal: needs a risk assessment, a peer review and approval from the service or product owner.
  • Emergency: needed to stop or prevent serious harm. Approved verbally by a named authority, then documented after the fact and reviewed.
  • Maintain the standard list as a controlled document, with an owner who adds and retires entries.
Good practice

The release checklist and the go or no-go call

The release SOP is mostly a checklist with a decision point. Before the window: confirm the change list, test evidence, rollback plan and communications. During: record start time, steps performed and any deviations. After: confirm health checks, update the change records and close the window.

Name who calls go or no-go and what conditions force a no-go, such as failed critical tests or an unavailable rollback owner. Detailed steps appear in the change management template and the software release template, and engineering-wide procedures are listed on the engineering department page.

In SOPGalaxy

Where SOPGalaxy helps

The release checklist, the standard change list and the rollback procedure can each be a versioned SOP with diffs and approval steps set up by your team. Comments and mentions let reviewers discuss sections in place, and audit logs record who approved each revision.