Procedures that follow the shift
A mine runs round the clock, so procedures anchored to the shift cycle matter most. Pre-start equipment checks, shift-change handover, ground control inspections, blast clearance and re-entry, and plant start-up and shutdown happen several times a day. Heavy mobile equipment adds its own layer: haul truck and loader checks, refuelling and workshop isolation.