A deviation is a departure from an approved procedure or specification, found during or after the work. This template separates recording from assessing from approving, and includes a planned-deviation route for changes needed before the work starts.

Template preview

Unplanned deviation: incubation time exceeded in a lab test

Copy it, download it as Markdown or CSV, or print it. It is a worked example: change the owners, steps and records to fit your process.

WORKED EXAMPLE

Deviation Handling

Adapt before use

Scenario: A technician finds a sample was left in the incubator longer than the method allows; the deviation runs from discovery to approval.

#StepOwnerWhat happens
1Record immediatelyTechnicianOpen a deviation entry before leaving the bench: method, sample ID, what the procedure required, what happened, time found, and who was told. Do not report the sample result yet.
2ContainLaboratory supervisorHold the sample result and any other samples from the same run. Check whether the incubator timer or the handover caused the delay and whether other runs were exposed.
3Assess impact and classifyQuality reviewerUse the classification table. Determine whether the extra time could change the result and whether the method has validated limits that cover it. Classify as minor, major or critical with written reasoning.
4Investigate causeLaboratory supervisorFor major and above, find the cause: unclear shift handover, missing timer alarm, or a misread instruction. Propose corrections to the procedure or equipment.
5Decide dispositionQuality managerApprove one outcome: result valid with justification, retest, or invalidate. Sign and date. Informing the client, where relevant, follows the complaint and notification procedures.
6Close and trendQuality reviewerClose once actions are complete. Add the deviation to the monthly trend table by method and cause; three on the same method open a CAPA.
Document owner: ______Approver: ______Version: ____Next review: ______
Guidance

When to use it, how to adapt it, what to avoid

Good practice

Unplanned deviations are found after the fact: a step skipped, a limit exceeded, a record incomplete. Planned deviations are temporary, approved departures before the work, such as using an alternate material for one batch.

Keep the routes distinct. A planned deviation needs approval before execution, with defined scope and duration. An unplanned one needs immediate containment and investigation.

FAQs

Questions this page often raises

Short, direct answers. Open any question, or expand them all.

Who is allowed to approve a planned deviation?
Name the role in the SOP, usually quality with technical input from the process owner. The requester must never be the sole approver. Record the scope, the end date and the reason.
Is a deviation always a failure?
No. A recorded, assessed deviation is the system working. The failure is an unrecorded one. See related guidance on quality documentation.